A small number of plants, measured properly

We're looking for water-cooled chiller plants to pilot advisory optimization of the condenser-water loop, with a monthly verified report.

Now selecting first pilot sites.

How onboarding works

From a trend export to your first monthly report

A pilot starts with data your BMS already keeps. No hardware needed to start, no network changes, and nothing is written to your equipment.

  1. Step 1

    Send a trend export

    Your BMS already logs chiller power, loop temperatures and flows. Export a month or more as CSV; we send point-by-point instructions for common BMS platforms. No hardware needed to start, no network changes.

    Your timeTypically under an hour

  2. Step 2

    We map and baseline

    We identify every point (the AI proposes, an engineer checks), run the physics checks and build your baseline.

    Your timeOne short call to confirm the point list

  3. Step 3

    Recommendations you approve

    Specific setpoint and water-side recommendations. Your operators accept or reject each one. Nothing is written to your equipment.

    Your decisionAccept or reject each one

  4. Step 4

    Monthly verified report

    kWh and gallons against your baseline, guardrails, and dollars at your tariffs. When you'd rather not send files, a cellular gateway we install, off your IT network, replaces the monthly export.

    You receiveA verified report every month

What we need from you
  • A BMS trend export (or read-only access later)
  • Water-treatment service logs, if you have them
  • Your utility tariffs
What we never do
  • Write to your controls without approval
  • Replace your BMS, your water-treatment company or your qualified person
What we add where it helps
  • Read-only flow meters on make-up and blowdown lines
  • Conductivity sensing where your tower controller doesn't log it
  • A cellular gateway, off your IT network, so reports run without exports

Most exports cover the chiller side well and the water side poorly. We supply and install these, priced separately from the service, so water savings can be measured, not estimated. None of it is needed to start.

Good fits

  • Water-cooled chillers with cooling towers
  • A BMS that trends chiller power, loop temperatures and flows (we can help check)
  • Plants that run most of the year: hospitals, campuses, labs, data rooms, warm climates
  • An owner or engineer who wants measured results, not promises

Not sure what your BMS trends? Run Plant Check first; the mapping shows us.

What does your BMS trend?

Tick the points your building management system logs. The count uses the same metric requirements as Plant Check.

Points your BMS trends

Plant Check could calculate 0 of 25 metrics from these points

Every metric first needs: Chiller power; either Chilled-water flow + Chilled-water supply temperature + Chilled-water return temperature or Measured cooling load.

  • Can't be calculated yet: Period covered
  • Can't be calculated yet: Sampling interval
  • Can't be calculated yet: Hours with chillers running
  • Can't be calculated yet: Chiller electricity
  • Can't be calculated yet: Cooling delivered
  • Can't be calculated yet: Average load while running
  • Can't be calculated yet: Peak load
  • Can't be calculated yet: Chiller efficiency (energy-weighted)
  • Can't be calculated yet: Chiller kW/ton, best 10% of running intervals
  • Can't be calculated yet: Chiller kW/ton, median running interval
  • Can't be calculated yet: Chiller kW/ton, worst 10% of running intervals
  • Can't be calculated yet: Cooling-tower fan electricity · needs Cooling-tower fan power
  • Can't be calculated yet: Tower fan energy per ton-hour · needs Cooling-tower fan power
  • Can't be calculated yet: Pump electricity · needs Pump power
  • Can't be calculated yet: Whole-plant efficiency (chillers + towers + pumps mapped) · needs either Cooling-tower fan power or Pump power
  • Can't be calculated yet: Hours with chillers on below 5% of peak load
  • Can't be calculated yet: Plant electricity used in those standby hours
  • Can't be calculated yet: Share of plant electricity used in standby hours
  • Can't be calculated yet: Chilled-water delta-T (median while running) · needs Chilled-water supply temperature; Chilled-water return temperature
  • Can't be calculated yet: Lift (median while running) · needs Condenser water to tower; Chilled-water supply temperature
  • Can't be calculated yet: Condenser-water range (median while running) · needs Condenser water to tower; Condenser water from tower
  • Can't be calculated yet: Tower approach to wet-bulb (median while running) · needs Condenser water from tower; Outdoor wet-bulb temperature
  • Can't be calculated yet: Tower approach, worst 10% of running intervals · needs Condenser water from tower; Outdoor wet-bulb temperature
  • Can't be calculated yet: Mapped tower fan speed (median while running) · needs Cooling-tower fan speed
  • Can't be calculated yet: Share of running hours with the mapped tower fan at ≥95% speed · needs Cooling-tower fan speed

Also useful for a pilot (not used by Plant Check): tower water logs (conductivity, cycles), chemical feed records, Legionella results, utility bills

Tell us about your plant

We use this only to reply to you. No mailing lists unless you ask.